Page not found

Search results

  1. Scott Valley Groundwater Advisory Committee Meeting

    Slides Meeting Slides Image Slideshow Display Contact Info Block Web Page Calendar Event Menu Settings ... %). Alfalfa irrigation schedule- July 10 end date Alfalfa irrigation ceases on July 10th of every growing ... vegetation with a k_c value of 1.0. Assumes that all fields with 5% or more of their area overlapping with ...

    12/06/2023 - 1:14pm

  2. Applications and Permits

    Penalties for late payments- all annual fees are due within 30 days of the billing date. A cumulative 10% of ... PLEASE SCHEDULE AN APPOINTMENT 3- 5 WORKING DAYS IN ADVANCE OF YOUR INTENDED OPENING DATE. A HEALTH ... Permits eh_20170707_ehfeeschedule.pdf 2017/18 2019 2020 I FOODS FOODS CLASS I $95.00 A. Minor food Service ...

    10/19/2023 - 2:21pm

  3. Workshop on Efficient Water Management for Forage Crops

    Image Slideshow Display Contact Info Block Web Page Calendar Event Menu Settings Workshop on Efficient ... = Average of low 1/4 All Field Average Target Application = 1.0 inch DU = 90% 0.90” 1.10” 0.95” 1.05” DU ... Kc  1.05- 1.10 from 2-3 days after irrigation till the next cutting APPLICATION RATE < < SOIL ...

    03/21/2024 - 3:43pm

  4. Aboveground Petroleum Storage

    :___________________________________________________________________________________________________________________________________________________________________ SCPHD UN-003 Page 1 of 3 Rev. 12/15/03 10. Name of Licensed Transporter of ... Environmental Health\Misc Letters, Calendars, etc\List of environmental consultants.doc Baker Environmental 550 ... in the “Notice to Comply” in the attached CUPA Inspection Report must be corrected within 30 days of ...

    01/22/2024 - 10:09am

  5. Flood Control and Water Conservation District

    Signature____________________________________________________________________________________ Date Date The POST-EVENT field review of the event course took place ... 17-10  that now prohibits all overnight camping at Lake Shastina.  The campground is now limited to Day Use ... application to the address listed below a minimum of two (2) months prior to the event date. Siskiyou County ...

    11/22/2023 - 3:23pm

  6. Planning Commission Meeting

    (10) calendar days of today’s meeting (if the 10th day falls on a weekend, the appeal must be received ... Notations and Recommended Conditions of Approval Notations 1. Within ten (10) days following the date of the ... Web Page Calendar Event Maps Menu Settings McMahon Zone Change (Z-23-05) and Boundary Line Adjustment ...

    03/20/2024 - 10:36am

  7. RFP- Vehicle/Waste Removal and Disposal

    timeframes. 4. Failure or refusal to enter into a contract within ten (10) calendar days following the receipt ... rendered. 4.03 Date for Payment of Compensation: County will endeavor to make payment within 30 days of ... of Events Estimated Dates Activity 6-30-2023 Release of Request for Proposal (RFP) 7-7-2023 Mandatory ...

    07/28/2023 - 4:05pm

  8. State Inmate Early Release Program

    Your request must be post marked within 30 calendar days from the date you were served this decision ...

    02/09/2024 - 2:17pm

  9. Archived Documents

    County: No entry. This field will auto-populate from the Information worksheet. Date: No entry. This field ... field will auto-populate from the Information worksheet. Date: No entry. This field will auto-populate ... Program, leave this field blank, but provide a comment on the Worksheet 10. Rows 14-113, Column D: ...

    09/27/2023 - 11:50am

  10. Policy and Labor Contracts

    bi-weekly pay period, the anniversary date shall be adjusted to the first day of the present pay period or ... Service: The number of calendar days during which work was actually performed for Siskiyou County which has ... regulation by the Board of Supervisors. Day: A calendar day unless otherwise specified. Demotion: A reduction ...

    03/26/2024 - 2:48pm

Pages