Page not found

Search results

  1. Scott Valley Groundwater Advisory Committee Meeting

    Slides Meeting Slides Image Slideshow Display Contact Info Block Web Page Calendar Event Menu Settings ... 20-30 cfs 30-40 cfs Above 40 cfs Trying to represent this in a more informative way: Identify the day of ... , 1991-2018 – sorted early to late 41 Fall Reconnection Date, 1991-2018 – sorted early to late 2022-like ...

    12/06/2023 - 1:14pm

  2. Workshop on Efficient Water Management for Forage Crops

    cutting, and during hay curing onto the ground ✓At least 6- to 20-day periods during which fields cannot be ... Image Slideshow Display Contact Info Block Web Page Calendar Event Menu Settings Workshop on Efficient ... Survey 2018, (DWR-UCD) Approximately 30% decline in field crops between 2006 and 2017 and increase in ...

    03/21/2024 - 3:43pm

  3. Aboveground Petroleum Storage

    Environmental Health\Misc Letters, Calendars, etc\List of environmental consultants.doc Baker Environmental 550 ... Valley Tire 5 gallon containers/20 gallons max. Hwy 3 Ft. Jones Happy Camp Transfer Station 5 gallon ... containers/20 gallons max. Happy Camp, CA Black Butte Landfill 5 gallon containers/20 gallons max. Mt. Shasta, ...

    01/22/2024 - 10:09am

  4. Klamath Dam Decommissioning Project

    at $450 million. Supporting documents, including the summary and most up-to-date reports are below.  ... Siskiyou Board Meeting Dates Lower Klamath Hydroelectric Decommissioning Project *dates subject to change* ... Attachment 8 – Schedule of Special Board Meeting Dates December 6, 2022, Staff Presentation Notes to Siskiyou ...

    03/28/2024 - 9:38am

  5. Archived Documents

    Fiscal Year (20YY-YY): Press UP or DOWN arrow to read through the instructions. Row 1: Enter the date ... County: No entry. This field will auto-populate from the Information worksheet. Date: No entry. This field ... field will auto-populate from the Information worksheet. Date: No entry. This field will auto-populate ...

    09/27/2023 - 11:50am

  6. State Inmate Early Release Program

    Your request must be post marked within 30 calendar days from the date you were served this decision ...

    02/09/2024 - 2:17pm

  7. Klamath Dams

    Plan”) (dated October 16, 2018) (Appendix B) • Draft Environmental Impact Report (EIR) for the Lower ... to date on the progress by Ferc Online link. As a result of the applications filed to FERC, the ... License Surrender, Project 1480 November 2, 2018- Letter to FERC Comments re Definite Plan, Projects ...

    11/22/2023 - 3:27pm

  8. Applications and Permits

    Penalties for late payments- all annual fees are due within 30 days of the billing date. A cumulative 10% of ... within 30 days of hire. THE HEALTH DEPARTMENT WILL APPROVE OR REJECT PLANS WITHIN 20 DAYS AFTER RECEIPT ... PLEASE SCHEDULE AN APPOINTMENT 3- 5 WORKING DAYS IN ADVANCE OF YOUR INTENDED OPENING DATE. A HEALTH ...

    10/19/2023 - 2:21pm

  9. Policy and Labor Contracts

    bi-weekly pay period, the anniversary date shall be adjusted to the first day of the present pay period or ... Service: The number of calendar days during which work was actually performed for Siskiyou County which has ... regulation by the Board of Supervisors. Day: A calendar day unless otherwise specified. Demotion: A reduction ...

    03/26/2024 - 2:48pm

  10. Planning Documents

    2018-19 2019-20 Route 1 21,566 20,966 19,703 15,981 N/A 10,325 12,972 13,406-39.8%-37.8% Route 2 20 ... FY 2019-20 Source: STAGE Operating Reports, 2020 Fiscal Year g 2011-12 to 2018-19 (Pre- COVID) ... 2018............................................... 13 Table 6: Existing STAGE Weekday Service ...

    02/05/2024 - 3:03pm

Pages