Public Works - Closures & Delays

Salmon River Road #2B01, Mile Post 5.7 – Emergency Flood Damage Repairs.

  • Road closure tentatively scheduled for Mid-December 2017 thru March 2018.
  • Scheduled closure period is approximate and subject to change.
  • Design includes a 10 foot wide, single lane detour road.

Road Closure Definitions
Hard Closure: Pedestrian and or vehicle traffic prohibited at all times.
                       A minimum of 7 calendar days advance notice required.
                       Hard closures will be contractually prohibited on weekends
                       and legal holidays.

Soft Closure: Roadway will be closed during the hours of 8:00 A.M. thru 5:00 P.M.
                      Exceptions will be made for pedestrian traffic, United States Postal Service
                      delivery and emergency vehicles.

  • Several construction activities will likely require a hard closure. Examples include removal of the temporary bailey bridge, construction of the temporary detour road, and paving operations.
  • Check this page for updates. (Page Modified 11/02/17)

Public Works Resource Center

Resource Title Downloadable File Type
Encroachment Permit Application - Updated 2017 Download File Permit
Public Works District Map Download File Other
Public Works Snow Removal Policy Download File Policy
Transportation Permit Download File Permit