North Old Stage Road Rehabilitation 2010

  • Deteriorated Asphalt Surface Is Removed and Base Prepared

  • Hot Mix Asphalt Is Placed

  • Hot Mix Asphalt Is Compacted

  • Centerline Striping Is Applied to Finished Roadway

Public Works - North Old Stage Road Rehabilitation 2010

Rehabilitation and AC overlay of 9.5 miles of North Old Stage Road

The contractor worked through inclement weather and used it to their advantage.   The roadway super elevation and cross slope was restored to the original design.

Project Status: 

Completed

Project Contractor: 

J.F. Shea Construction, Inc.

Project Cost: 

$2,663,300.02