RFB - Weed Airport Taxiway & Apron Reconstruction Project
Please Note: An addendum was added on April 10 and a second addendum on April 17, see Supporting Documents below.
The Contractor shall provide unit prices for both the base bid. The Construction of the Taxiway and Apron Reconstruction Project – Phase 1 includes two (2) base bid schedules and two bid alternates as follows:
Base Bid Schedules I and II include the pulverization of the existing asphalt taxiways and aprons, earthwork and grading operations, pulverizing the existing pavement section, subgrade preparation, re-use of the pulverized material as recycled asphalt aggregate base, asphalt concrete, installation of storm drain pipe and facilities, pavement markings, and installation of airfield electrical facilities.
Bid Alternates 1 and 2 include the pulverization of the existing asphalt taxiways and aprons, earthwork and grading operations, pulverizing the existing pavement section, subgrade preparation, re-use of the pulverized material as recycled asphalt aggregate base, asphalt concrete, installation of storm drain pipe and facilities, pavement markings, and installation of airfield electrical facilities.
Please Note: Some pages were impossible to make accessible because of the nature of the presentation, drawings, etc. Please contact the General Services Department if you need clarification.