Required Inspections
This list represents a guideline and may or may not be all inclusive:
- FOUNDATION
- Trenches
- Required steel in place
- Material on site unless transit mix
- Forms set
- Prior to grouting masonry units
- CONCRETE SLAB OR UNDERFLOOR
- All in-slab or under floor building service equipment, conduit, piping, ducting and auxiliary equipment items are in place, but before any concrete placement or floor sheathing installed, including the sub-floor.
- FRAMING
- All framing members
- Fire-blocking
- Bracing
- Electrical
- Piping and testing
- Chimneys
- Vents
- Roofing
- Ducts
- Glazing
- INSULATION
- All insulating materials in place.
- LATH/WALLBOARD
- In place but prior to plastering or taping.
- FINAL
- After finish grading and the building is complete.